Phase 06: Post-Deployment Cluster Configuration
DOCUMENT CATEGORY: Implementation Runbook
SCOPE: Azure Local cluster post-deployment configuration
PURPOSE: Complete post-deployment cluster setup including management tools, security, storage, and logical networks MASTER REFERENCE: Azure Local post-deployment tasks
Status: Active Applies To: Azure Local clusters following cluster deployment (Phase 05) Last Updated: 2026-11-08
Table of Contents
- Task 01 – Deploy SDN
- Task 02 – Cluster Quorum Configuration
- Task 03 – Security Groups Applied to Nodes
- Task 04 – SSH Connectivity to Nodes
- Task 05 – Storage Configuration
- Task 06 – Image Downloads
- Task 07 – Configure Network Security Groups
- Task 08 – Logical Network Creation
- Task 09 – Post-Deployment Verification
- Task 10 – Enable External Storage (Hybrid S2D plus SAN) (only when a SAN is attached to a hyperconverged cluster)
- Task 11 – SBE Update Import (only when an update reports AdditionalContentRequired)
Phase Details
Objective
Complete post-deployment cluster configuration including management tools, security, storage, and networking infrastructure for workload VM deployment.
Tasks
- Deploy Software Defined Networking (SDN) infrastructure including Network Controller, Software Load Balancer, and RAS Gateway (Coming Soon)
- Configure cluster quorum settings (Cloud Witness, File Share Witness, or Disk Witness)
- Apply security groups to cluster nodes for RBAC and administrative access control
- Configure SSH connectivity to cluster nodes for remote administration and troubleshooting
- Review and configure Storage Spaces Direct pool (capacity, resiliency, health)
- Create CSV volumes for VM storage with naming conventions, resiliency settings, and provisioning type
- Create storage paths in Azure mapped to CSV volumes
- Hybrid clusters only: attach a Fibre Channel or iSCSI SAN beside Storage Spaces Direct as a day-2 operation (Task 10)
- Download and stage VM images (Azure Marketplace or custom images) to storage paths
- Create logical networks for workload VLANs with VLAN IDs, IP pools, and network properties
- Verify virtual switch configuration and network intent deployment
- Run post-deployment verification across all tasks
- Import the hardware vendor SBE files when an update reports AdditionalContentRequired (Task 11, SBE update import)
Outcome
Cluster fully configured with management tools, security controls, storage infrastructure, and logical networks ready for workload VM deployment.
Navigation
| Previous | Up | Next |
|---|---|---|
| Phase 05: Cluster Deployment | Cluster Deployment Overview | Part 5: Operational Foundations |
References:
- Microsoft Learn - Post Deployment Configuration
- Microsoft Learn - Plan SDN Infrastructure
- Microsoft Learn - Storage Spaces Direct
Document maintained by Azure Local Cloud Team. Part of the Azure Local Implementation Guide.