Task 04: Validation Sign-Off
DOCUMENT CATEGORY: Runbook SCOPE: Validation documentation and sign-off PURPOSE: Document validation results and obtain approval to proceed MASTER REFERENCE: Azure Local Cloud Deployment Standards
Status: Active Estimated Time: 30 minutes
Overview
Complete the Phase 02 validation sign-off by documenting all validation results, collecting artifacts, and obtaining approval to proceed with site network configuration.
This sign-off document becomes a permanent project artifact and provides audit trail for deployment readiness.
Validation Sign-Off Template
Copy and complete this template for project documentation:
# Phase 09: Enterprise Network Readiness Validation Sign-Off
## Deployment Information
| Field | Value |
|-------|-------|
| **Site Name** | [Customer Site Name] |
| **Site Code** | [SITE_CODE] |
| **Validation Date** | [YYYY-MM-DD] |
| **Validated By** | [Engineer Name] |
| **Validation Workstation** | [IP Address / Hostname] |
---
## Validation Results Summary
### Task 1: Visual Hardware Inspection
| Check | Status | Notes |
|-------|--------|-------|
| Servers racked and powered | ☐ PASS / ☐ FAIL | |
| Network cabling complete | ☐ PASS / ☐ FAIL | |
| OpenGear installed | ☐ PASS / ☐ FAIL | |
| TOR switches installed | ☐ PASS / ☐ FAIL | |
**Step 1 Status**: ☐ PASS / ☐ FAIL
---
### Task 2: Customer Network Service Verification
| Service | Status | Notes |
|---------|--------|-------|
| DNS - AD Domain Controllers | ☐ PASS / ☐ FAIL | |
| DNS - Planned Node FQDNs | ☐ PASS / ☐ N/A | Optional - may be created later |
| NTP - Time Synchronization | ☐ PASS / ☐ FAIL | |
| Ping - OpenGear Console | ☐ PASS / ☐ FAIL | |
| Ping - Default Gateway | ☐ PASS / ☐ FAIL | |
**Step 2 Status**: ☐ PASS / ☐ FAIL
---
### Task 3: OpenGear Lighthouse Verification
| Check | Status | Notes |
|-------|--------|-------|
| Node visible in Lighthouse | ☐ PASS / ☐ FAIL | |
| Node status Online | ☐ PASS / ☐ FAIL | |
| Serial ports configured | ☐ PASS / ☐ FAIL | |
| Console access working | ☐ PASS / ☐ FAIL | |
| iDRAC connectivity | ☐ PASS / ☐ FAIL | |
**Step 3 Status**: ☐ PASS / ☐ FAIL
---
## Overall Assessment
| Overall Status | ☐ READY TO PROCEED / ☐ BLOCKED |
|----------------|--------------------------------|
### Blocking Issues (if any)
| Issue | Severity | Owner | Resolution ETA |
|-------|----------|-------|----------------|
| | | | |
---
## Approval
| Role | Name | Date | Signature |
|------|------|------|-----------|
| Azure Local Cloud Engineer | | | |
| Customer Network Contact | | | |
| Project Manager | | | |
---
## Artifacts Collected
- [ ] Hardware inspection checklist (completed)
- [ ] Network service test output
- [ ] Network service test notes
- [ ] Lighthouse screenshot (node online)
- [ ] This signed sign-off document
Rapid Sign-Off Checklist
Use this for expedited deployments where full documentation is gathered post-deployment:
| Phase 02 Step | Status | Engineer Initials |
|---|---|---|
| Task 1: Hardware Inspection | ☐ PASS | |
| Task 2: Customer Network Services | ☐ PASS | |
| Task 3: OpenGear Verification | ☐ PASS |
Overall: ☐ READY TO PROCEED
Validated By: _________________ Date: _________
Full sign-off documentation must be completed within 48 hours of deployment completion.
Artifact Collection
Collect All Validation Artifacts
# Define paths
$ProjectName = "AZL-CustomerName"
$ArtifactSource = "C:\git\Azure Local Cloud-docs-azl-toolkit\artifacts\phase-02-enterprise-readiness-validation"
$ProjectDocs = "C:\Projects\$ProjectName\validation\phase-02-enterprise-readiness"
# Create project documentation folder
New-Item -Path $ProjectDocs -ItemType Directory -Force
# Copy all artifacts
Copy-Item -Path "$ArtifactSource\*" -Destination $ProjectDocs -Recurse
# List collected artifacts
Write-Host "`n=== Collected Artifacts ===" -ForegroundColor Cyan
Get-ChildItem -Path $ProjectDocs -Recurse | Format-Table Name, Length, LastWriteTime
Required Artifacts
| Artifact | Source | Status |
|---|---|---|
| Hardware inspection checklist | Step 1 | ☐ |
| Network service test notes | Step 2 | ☐ |
| Lighthouse-NodeStatus.png | Step 3 Screenshot | ☐ |
| SignOff-phase-02-enterprise-readiness.md | This document | ☐ |
Azure endpoint validation artifacts (Environment Checker output) will be collected in Phase 03 Step 4 after network infrastructure is configured.
Sign-Off Workflow
1. Complete Validation Summary
Fill in all sections of the sign-off template above.
2. Collect Artifacts
Run the artifact collection script to gather all validation outputs.
3. Review with Stakeholders
Schedule brief review meeting (15-30 min) with:
- Customer network contact
- Azure Local Cloud project manager
- Deployment engineer
4. Obtain Signatures
Get approval from all parties before proceeding to Phase 03.
5. Archive Documentation
Save signed document to project folder:
Projects/
└── AZL-CustomerName/
└── validation/
└── phase-02-enterprise-readiness/
├── SignOff-phase-02-enterprise-readiness-SIGNED.pdf
├── ValidationReport.html
├── EnvironmentChecker-Connectivity.txt
└── Lighthouse-NodeStatus.png
Next Steps
| Sign-Off Complete? | Next Action |
|---|---|
| ✅ Yes - All Approved | Proceed to Phase 10: Network Infrastructure |
| ❌ No - Issues Found | Resolve blocking issues with customer network team |
| ⏸️ Pending Approval | Schedule sign-off meeting |
Phase 02 Complete
Upon successful sign-off, the following has been validated:
- ✅ Physical infrastructure installed correctly
- ✅ DNS services operational
- ✅ NTP time synchronization working
- ✅ Azure endpoint connectivity confirmed
- ✅ OpenGear console access verified
- ✅ Customer approval obtained
Proceed to Phase 10: Network Infrastructure Configuration
Acceptance Criteria
- All Phase 02 validation steps completed with PASS status
- Sign-off template filled with all required information
- All artifacts collected and archived in project folder
- Approval obtained from customer and Azure Local Cloud representatives
- Documentation archived to
artifacts/phase-02-enterprise-readiness-validation/SignOff-phase-02-enterprise-readiness-SIGNED.pdf
Navigation
| ← Task 03: OpenGear Verification | ↑ Part 3: On-Premises Readiness | Phase 03: Network Infrastructure → |
Version Control
| Version | Date | Author | Changes |
|---|---|---|---|
| 1.0 | 2025-06-04 | Azure Local Cloud Azure Local Cloudnology | Initial document |
| 1.1 | 2026-03-03 | Azure Local Cloud Azure Local Cloudnology | Standardized runbook format |
End of Task