Skip to main content
Version: Next

Phase 03 — Validation

Implementation Azure

DOCUMENT CATEGORY: Phase Overview SCOPE: Post-deployment validation PURPOSE: Verify resources and connectivity MASTER REFERENCE: Azure Portal

Status: Active Last Updated: 2026-02-07


Table of Contents


Phase Details

Objective

Verify that all Azure resources are deployed correctly, connectivity is established, and configuration meets requirements.

Tasks

  • Verify all Azure resources exist in correct resource groups with proper configuration
  • Test network connectivity including VPN, Bastion, and DNS resolution
  • Validate Key Vault access, Log Analytics configuration, and monitoring setup

Validation

  • All resource groups created with correct naming
  • VNet, subnets, NSGs deployed and configured
  • VPN Gateway online with BGP peering established
  • Azure Bastion accessible for VM management
  • Key Vault accessible with correct access policies
  • Log Analytics Workspace collecting data
  • DNS resolution working for cluster nodes
  • Optional servers (NDM/Utility) running if deployed
  • Cloud witness storage account accessible

Outcome

All deployed resources verified as functional with connectivity tested and configurations validated, ready for Azure Local cluster deployment.


PreviousUpNext
Phase 02 - Pipeline ExecutionCI/CD PipelineTask 01 - Verify Resources

Version Control

VersionDateAuthorChanges
1.0.02026-03-24Azure Local Cloudnology TeamInitial release