Phase 02 — Pipeline Execution
DOCUMENT CATEGORY: Phase Overview SCOPE: CI/CD pipeline pipeline execution PURPOSE: Deploy infrastructure via automated pipeline MASTER REFERENCE: CI/CD Pipeline Documentation
Status: Active Last Updated: 2026-02-07
Table of Contents
- Task 01 – Commit and Push Configuration
- Task 02 – Monitor Validate Stage
- Task 03 – Review Plan Stage
- Task 04 – Approve Deployment
- Task 05 – Monitor Apply Stage
- Task 06 – Verify Test Stage
Phase Details
Objective
Execute the CI/CD pipeline pipeline to deploy Azure management infrastructure through automated validation, planning, approval, and deployment stages.
Tasks
- Commit Terraform configuration changes and push to the repository
- Monitor the validation stage for syntax and security checks (~2 minutes)
- Review Terraform execution plan for resource changes (~3 minutes)
- Approve deployment after plan review (manual gate)
- Monitor infrastructure deployment during apply stage (45-90 minutes)
- Verify automated testing confirms successful deployment (~5 minutes)
Validation
- Code committed and pushed to repository successfully
- Validation stage passed (format check, validation, security scan)
- Plan stage completed with expected resource changes
- Terraform plan reviewed and approved by authorized user
- Apply stage completed without errors
- Test stage passed all validation checks
- Pipeline completed successfully with all green stages
Outcome
Azure management infrastructure successfully deployed via automated CI/CD pipeline pipeline with full audit trail and validation.
Navigation
| Previous | Up | Next |
|---|---|---|
| Phase 01 - Configuration | CI/CD Pipeline | Task 01 - Commit and Push |
Version Control
| Version | Date | Author | Changes |
|---|---|---|---|
| 1.0.0 | 2026-03-24 | Azure Local Cloudnology Team | Initial release |