Skip to main content
Version: Next

Phase 02 — Pipeline Execution

Implementation

DOCUMENT CATEGORY: Phase Overview SCOPE: CI/CD pipeline pipeline execution PURPOSE: Deploy infrastructure via automated pipeline MASTER REFERENCE: CI/CD Pipeline Documentation

Status: Active Last Updated: 2026-02-07


Table of Contents


Phase Details

Objective

Execute the CI/CD pipeline pipeline to deploy Azure management infrastructure through automated validation, planning, approval, and deployment stages.

Tasks

  • Commit Terraform configuration changes and push to the repository
  • Monitor the validation stage for syntax and security checks (~2 minutes)
  • Review Terraform execution plan for resource changes (~3 minutes)
  • Approve deployment after plan review (manual gate)
  • Monitor infrastructure deployment during apply stage (45-90 minutes)
  • Verify automated testing confirms successful deployment (~5 minutes)

Validation

  • Code committed and pushed to repository successfully
  • Validation stage passed (format check, validation, security scan)
  • Plan stage completed with expected resource changes
  • Terraform plan reviewed and approved by authorized user
  • Apply stage completed without errors
  • Test stage passed all validation checks
  • Pipeline completed successfully with all green stages

Outcome

Azure management infrastructure successfully deployed via automated CI/CD pipeline pipeline with full audit trail and validation.


PreviousUpNext
Phase 01 - ConfigurationCI/CD PipelineTask 01 - Commit and Push

Version Control

VersionDateAuthorChanges
1.0.02026-03-24Azure Local Cloudnology TeamInitial release