Phase 01: Hardware Provisioning and BIOS/iDRAC Configuration
Discover cluster node hardware, configure DHCP reservations, validate and remediate BIOS/iDRAC settings against Dell Azure Local validated baselines before OS installation.
Discover cluster node hardware, configure DHCP reservations, validate and remediate BIOS/iDRAC settings against Dell Azure Local validated baselines before OS installation.
Prepare Dell hardware boot configuration, verify ISO availability, and install Azure Stack HCI OS on each cluster node before OS configuration.
Delete and recreate virtual disks on Dell BOSS cards via iDRAC Storage Management or Redfish API for a clean OS installation target.
Discover all cluster node hardware using Dell iDRAC Redfish API, collecting hardware inventory, BIOS configuration, and iDRAC settings for use in subsequent tasks.