Phase 02: OS Installation
Prepare Dell hardware boot configuration, verify ISO availability, and install Azure Stack HCI OS on each cluster node before OS configuration.
Prepare Dell hardware boot configuration, verify ISO availability, and install Azure Stack HCI OS on each cluster node before OS configuration.
Mount the Dell Azure Stack HCI OS gold image ISO to all cluster nodes via iDRAC virtual media or USB drive, and verify mount status before BOSS card preparation.
Manually install Azure Stack HCI OS on each cluster node using iDRAC Virtual Console. The ISO was mounted in Task 02 — nodes boot directly into Windows Setup after the BOSS recreation reboot.